Tel: +971 (0) 4 368 2911Fax: +971 (0) 4 368 2859info@cogrimiddleeast.com

Regions CoGri operate in

  • Australian-Flag
  • Belgian Flag
  • Canadian flag
  • Chinese-Flag
  • French-Flag
  • German-Flag
  • Greek-Flag
  • Indonesian flag
  • Italian-Flag
  • Luxembourg flag
  • Malaysian-Flag
  • Dubai-Flag
  • Netherlands flag
  • New-Zealand-Flag
  • Singaporian Flag
  • South-African -Flag
  • South-Korean-Flag
  • Spanish-Flag
  • UK Flag
  • USA Flag
Floor Construction - Laser Screed ® Floors - Mesh Reinforced Large Pour Construction

Mesh Reinforced Large Pour Construction

Without a doubt the most cost effective technique for reinforcing a floor using the Laser Screed large pour construction method is with theLarge Pour Mesh Construction aid of standard mesh reinforcement.

Mesh is applied just ahead of the concrete placement on spacers from left to right, in the same direction as the Laser Screed strike off.

All mesh reinforced slabs will have sawn induced joints.



 

 

 

 

mesh reinforced large pour construction
mesh reinforced constructionmesh reinforced large pourFind out more about the CoGri Group
Click images to see larger
Find out more about "Superflat" High Tolerance Floors
Floor Construction - Laser Screed ® Floors - Mesh Reinforced Large Pour Construction